Ciudad de la Luz (City of Light) is an $88 million full-feature film studio on the Mediterranean that quickly set
The first two new stages to be built on the NBCUniversal lot in nearly 40 years have replaced smaller, outdated
First Southern California studio built from the ground up in 60 years. Phase I & II sound stages and production
Film and television production complex with nine soundstages, production support, commissary, mill/shops, production bungalows, post production, executive offices, studio store,
New England Studios is a new, tilt-up concrete, full-service motion-picture studio located half an hour outside of Boston. Master planned
Millennial Studios is the second phase expansion of Chapman University’s successful Film School. The new three-story structure will be home
Located in the outskirts of Manila, the project is situated amongst a series of steep hillsides and valleys that is
Conversion of three luxury boxes at Staples Center to a live-broadcast booth for the CBS News team at the 2000
Three sound stages built in Phase I with four more planned for Phases II and III. Each cluster of three
The film school emulates Hollywood working conditions in an educational environment. The facilities include Hollywood-style soundstages, TV, foley and motion
Designed by Bastien and Associates, Inc., St. Margaret’s new Performing Arts Center has received high praise from the school, the
This new venue in its beautiful Denver setting rates an "A" grade from the music critics! The project, with lead
Expansion of bar and food service amenities within the building and prefunction plaza areas as well as a second stage
A key component in the redesigned campus masterplan, The Center for Music and Performing Arts will frame the entry into
A 250-seat live performance venue in the heart of Hollywood. Envisioned to hold amateur singing competitions on a weekly basis
“In all my years working on amphitheaters, this is the most beautiful plan I have ever seen developed! The folks
Designed by Bastien and Associates, Inc., St. Margaret’s new Performing Arts Center has received high praise from the school, the
Millennial Studios is the second phase expansion of Chapman University’s successful Film School. The new three-story structure will be home
In 2015, St. Margaret's completed construction on Phase II of their northern campus renovations. This work included a new 2-story
A key component in the redesigned campus masterplan, The Center for Music and Performing Arts will frame the entry into
Film Makers Village was designed by Bastien and Associates, Inc. as the third phase of the Film School’s Campus. The
36,000 s.f. Tenant Improvement over two floors for Henry Mayo Newhall Memorial Hospital. The third floor was fully built out
The film school emulates Hollywood working conditions in an educational environment. The facilities include Hollywood-style soundstages, TV, foley and motion
The school of Film and Media Arts is located in Cleveland's historic Playhouse Square in the top floor the Idea
36,000 s.f. Tenant Improvement over two floors for Henry Mayo Newhall Memorial Hospital. The third floor was fully built out
The five-story building spans the main studio access road and has direct views to the Mediterranean. It shares the special
Project Category: Film/TV Studios Location: Costa Mesa, CA Gene Roddenberry Building, production support offices, Stage 18, Stage 27 Gallery, Hal
The two-story structure is situated at the center of the studio complex and serves all employees at the isolated campus
The CBS West Coast high definition flagship facility is the first duopoly of its kind, designed to serve KCBS 2
Three story multi-tenant office building with over-under parking garage, feature lobby, interiors.
A complete remodel of an existing steel frame and concrete panel warehouse building for use by a biomedical research company.
Bastien and Associates, Inc. was selected by the City of Santa Clarita to oversee a seismic retrofit of their existing
Phase 2 involved the construction of new product assembly clean rooms, laboratories, warehouse area and site work to add chillers,
A two story, high-end headquarters, tenant improvement including office and manufacturing spaces built within Building 1 at the Saturn and
Located at the corner of San Michele Road and Perris Boulevard in the industrial core of Moreno Valley. Built for
Single, industrial, tilt-up building built in the northern industrial corridor of Fullerton. Construction completed in 2017.
Seven industrial buildings built around the existing office headquarters of the Beckman Coulter facility. Due to the existing building’s historic
Industrial park with 3 tilt-up concrete warehouse buildings built along the 10-freeway at the Etiwanda Avenue exit.Building 1: 219,431 s.f.,
Three building, tilt-up concrete industrial built adjacent to the Ontario airport. Building sizes ranged from 102,000 s.f. up to an
A single, concrete tilt-up industrial building including 2-story tenant improvements.
Tilt-up concrete warehouse/distribution building with cross-dock loading.